Broomley Road Bridge Replacement Update

Broomley Road Bridge

 

VDOT is preparing to advertise for the Broomley Road bridge replacement project. They will close the bridge and detour traffic to accommodate the construction of the bridge.    The advertisement date is December 2014 and construction should begin in March of 2015.  VDOT anticipates an eight month closure.

VDOT created the following detour map: 677 Detour Map for Bridge Replacement. The detour will route you into the neighborhood via Owensville>Old Ballard>Woodberry.

This entry was posted in Uncategorized and tagged . Bookmark the permalink.